Conversion Forge· Ops Board
director: Tokelo · stage A · 3-panel MVP
baked 0h ago
host MaxEater

Engines

10 engines · 25 open tasks2 blocked
E2

ScaleBespoke

75d ⏱⏱

Active outreach across 10 sectors

0 open

no outstanding tasks tracked

E7

Trading Expansion

concept-only
73d ⏱⏱

NOT YET ACTIVE — 3 preconditions pending

0 open

concept-only — no build infrastructure yet

E6

AI Influencer Network

66d ⏱⏱

framework shipped 15 May 2026 — cognitive layer end-to-end, generation deferred

0 open

no outstanding tasks tracked

E0

Trading Bot

62d ⏱⏱

Running, PAPER MODE (Day 1 of 7 go-live streak)

8 open7 overview1 deferred1 blocked
  • overview
    Streak protection: restart = streak resets to Day 0. Day 1 of 7 currently in progress (started ~2026-05-12). DO NOT TOUCH VPS.
    0d
  • overview
    9-3 constraint: Engine 0 morning check ~10 mins, then walk away. Bot fixes ONLY in 13:00–15:00 Conversion Forge block.
    0d
  • overview
    Walk-away rule: bot error before 11am → log, walk away, fix in afternoon block.
    0d
E4

Conversion Forge

51d ⏱

active

9 open1 queue8 overview
  • queue
    Prospect → Handover pipeline — build queue
    73d
  • overview
    cf-prospect-stack proposal generator dual-emit — DONE 02 Jun (original priced-stages mode) + EXTENDED 03 Jun with `discovery` mode for 8-section no-pricing prepared-read pattern (Jarrell-style). Jarre
    0d
  • overview
    cf-proposal-fit — viability discriminator (`scripts/cf-proposal-fit <slug>`), 360 lines, heuristic-only (no LLM call, deterministic). Reads manifest + pmc + intake notes, scores 3 modes (priced-stages
    0d
E1

Food Engine

17d ⏱

Active outreach, Onzy client (7 Oaks Grill)

0 open

no outstanding tasks tracked

E3

Persa London

17d ⏱

shop transactional pending SSL on persalondon.com; Stripe wired in full (03 Jun

5 open5 overview
  • overview
    Inventory dashboard (D1 → admin panel) for unified eCom view (Etsy + eBay + FB + IG + shop)
    0d
  • overview
    Wait for SSL on persalondon.com + re-smoke test against new domain
    0d
  • overview
    Once Zahra finishes Meta walkthrough: assign Persa Page + IG to CF Meta App `claude-automation` System User (closes CF Meta App pinned thread too)
    0d
E5

KDP / Butterology

passive
17d ⏱

Active rewrite to publish-ready

0 open

passive engine — surfaces only when revenue changes

E9

E9 — AdSense Fleet (symbiotic passive-income sites)

14d ⏱

SPEC (2 Jul 2026). Decisions LOCKED, domains BOUGHT, harness build fires on "you

0 open

no outstanding tasks tracked

E8

Ace of Clubs (AoC) Operations

4d

active

3 open1 queue2 deferred1 blocked
  • queue
    Respond to Nico's AoC website-build brief
    79d
  • PARKED
    tally-photo population — "moving forwards".
    13d
  • BLOCKED
    February-May migration — Nico's 3 answers + attribution sitting answer. Engine-0 prompt reorders + bot-VPS Ollama — Director sign-off, paper-mode caution. KV 5-repo fleet digest — low urgency post-audit. Texting-brain build (answer-rate SPE
    5d

Active builds

24 queued

Conversion Forge — full marketing-skill reupholstery plan

PARKED — full marketing skill reupholste82d
10%

Flowbite + Tailwind integration spec

spec — install authorised by Director 1282d
10%

LightRAG integration spec

spec — authorised by Director 12 May ("p82d
10%

LiteLLM integration spec

INSTALLED 12 May 2026 — integration pend82d
10%

Persa London — Demo → Live Plan

ACTIVE — phases ordered by Director-impa82d
10%

WhatsApp integration — "guy in the chair" spec

spec — awaiting Director go-ahead on mec82d
10%

Business Idea Generator

spec — Director-requested 12 May 202680d
10%

Respond to Nico's AoC website-build brief

pending79d
10%

Build A — Gate Consolidation (v2 — derail-checked)

SIGNED-OFF 2026-05-21 by Director — read73d
10%

LLM Router Upgrade — May 2026 Scout

scout-complete — awaiting Director sign-73d
10%

Prospect → Handover pipeline — build queue

pending-director-greenlight73d
10%

System Build Itinerary — 2026-05-21

active73d
10%

2026 05 22 cf ops board akatsuki

pre-orchestrate72d
13%

CF OPS BOARD — BOARDROOM BRIEF

pre-orchestrate72d
13%

2026 05 22 cf ops board kimi

pre-orchestrate72d
13%

Boardroom Orchestration Run

pre-orchestrate72d
13%

2026 05 22 cf ops board premortem

pre-orchestrate72d
13%

2026 05 22 cf ops board shonen

pre-orchestrate72d
13%

CF OPS BOARD — HARDENED SPEC (post-panels, pre-kimi)

pre-kimi-gate72d
63%

Build queue — Subconscious Letta exit (Stage 2) — **SHIPPED 22 May 2026**

pre-orchestrate72d
13%

LLM Router Upgrade — June 2026 re-scout

rescout-complete — awaiting Director sig61d
10%

QUEUE: no-venue bin (57 photos) is NOT a venue-only problem — needs extractor pass

DEFERRED/BLOCKED — blocked by extraction53d
10%

Queue items from second-brain day-1 review (6 Jul 2026)

pre-orchestrate27d
13%

Idea review queue

pre-orchestrate2d
13%

Recent ships

last 14 days · 0 items