Conversion Forge· Ops Board
director: Tokelo · stage A · 3-panel MVP
baked 0h ago
host MaxEater

Engines

10 engines · 30 open tasks4 blocked
E2

ScaleBespoke

125d ⏱⏱

Active outreach across 10 sectors

0 open

no outstanding tasks tracked

E7

Trading Expansion

concept-only
125d ⏱⏱

NOT YET ACTIVE — 3 preconditions pending

0 open

concept-only — no build infrastructure yet

E5

KDP / Butterology

passive
76d ⏱⏱

Active rewrite to publish-ready

0 open

passive engine — surfaces only when revenue changes

E9

E9 — AdSense Fleet (symbiotic passive-income sites)

73d ⏱⏱

SPEC (2 Jul 2026). Decisions LOCKED, domains BOUGHT, harness build fires on "you

0 open

no outstanding tasks tracked

E8

Ace of Clubs (AoC) Operations

57d ⏱

active

4 open1 queue3 deferred1 blocked
  • queue
    Respond to Nico's AoC website-build brief
    138d
  • BLOCKED
    Sebastian send — Director's payments context not received · receipts watcher — Cardinal 21 registration · aoc-cpanel token — Director to regenerate · Zoho order-mail filter — Zoho UI.
    9d
  • REQUEUED
    Metronome AoC sequences — agreed on call, drafting next; sending-domain SPF/DKIM/DMARC for aceofclubslondon.com — ; coordinator bot relink — needs the coordinator phone; Selene etc. photos — Nico to supply; gender split — redline, not build
    6d
E1

Food Engine

39d ⏱

Active outreach, Onzy client (7 Oaks Grill)

2 open2 queue
  • queue
    No-website prospects — outreach (Fri 25 Sep, 10:00–11:00)
    6d
  • queue
    E12 trend-book generator — queued 1 Oct 2026 (Director, mid-session)
    0d
E3

Persa London

39d ⏱

shop transactional pending SSL on persalondon.com; Stripe wired in full (03 Jun

5 open5 overview
  • overview
    Inventory dashboard (D1 → admin panel) for unified eCom view (Etsy + eBay + FB + IG + shop)
    0d
  • overview
    Wait for SSL on persalondon.com + re-smoke test against new domain
    0d
  • overview
    Once Zahra finishes Meta walkthrough: assign Persa Page + IG to CF Meta App `claude-automation` System User (closes CF Meta App pinned thread too)
    0d
E4

Conversion Forge

39d ⏱

active

10 open1 queue8 overview1 deferred1 blocked
  • queue
    Prospect → Handover pipeline — build queue
    132d
  • overview
    cf-prospect-stack proposal generator dual-emit — DONE 02 Jun (original priced-stages mode) + EXTENDED 03 Jun with `discovery` mode for 8-section no-pricing prepared-read pattern (Jarrell-style). Jarre
    0d
  • overview
    cf-proposal-fit — viability discriminator (`scripts/cf-proposal-fit <slug>`), 360 lines, heuristic-only (no LLM call, deterministic). Reads manifest + pmc + intake notes, scores 3 modes (priced-stages
    0d
E6

AI Influencer Network

39d ⏱

framework shipped 15 May 2026 — cognitive layer end-to-end, generation deferred

0 open

no outstanding tasks tracked

E0

Trading Bot

30d ⏱

Running, PAPER MODE (Day 1 of 7 go-live streak)

9 open7 overview2 deferred2 blocked
  • overview
    Streak protection: restart = streak resets to Day 0. Day 1 of 7 currently in progress (started ~2026-05-12). DO NOT TOUCH VPS.
    0d
  • overview
    9-3 constraint: Engine 0 morning check ~10 mins, then walk away. Bot fixes ONLY in 13:00–15:00 Conversion Forge block.
    0d
  • overview
    Walk-away rule: bot error before 11am → log, walk away, fix in afternoon block.
    0d

Active builds

39 queued

Conversion Forge — full marketing-skill reupholstery plan

PARKED — full marketing skill reupholste141d
10%

Flowbite + Tailwind integration spec

spec — install authorised by Director 12141d
10%

LightRAG integration spec

spec — authorised by Director 12 May ("p141d
10%

LiteLLM integration spec

INSTALLED 12 May 2026 — integration pend141d
10%

Persa London — Demo → Live Plan

ACTIVE — phases ordered by Director-impa141d
10%

WhatsApp integration — "guy in the chair" spec

spec — awaiting Director go-ahead on mec141d
10%

Business Idea Generator

spec — Director-requested 12 May 2026139d
10%

Respond to Nico's AoC website-build brief

pending138d
10%

Build A — Gate Consolidation (v2 — derail-checked)

SIGNED-OFF 2026-05-21 by Director — read132d
10%

LLM Router Upgrade — May 2026 Scout

scout-complete — awaiting Director sign-132d
10%

Prospect → Handover pipeline — build queue

pending-director-greenlight132d
10%

System Build Itinerary — 2026-05-21

active132d
10%

2026 05 22 cf ops board akatsuki

pre-orchestrate131d
13%

CF OPS BOARD — BOARDROOM BRIEF

pre-orchestrate131d
13%

2026 05 22 cf ops board kimi

pre-orchestrate131d
13%

Boardroom Orchestration Run

pre-orchestrate131d
13%

2026 05 22 cf ops board premortem

pre-orchestrate131d
13%

2026 05 22 cf ops board shonen

pre-orchestrate131d
13%

CF OPS BOARD — HARDENED SPEC (post-panels, pre-kimi)

pre-kimi-gate131d
63%

Build queue — Subconscious Letta exit (Stage 2) — **SHIPPED 22 May 2026**

pre-orchestrate131d
13%

LLM Router Upgrade — June 2026 re-scout

rescout-complete — awaiting Director sig120d
10%

QUEUE: no-venue bin (57 photos) is NOT a venue-only problem — needs extractor pass

DEFERRED/BLOCKED — blocked by extraction112d
10%

Queue items from second-brain day-1 review (6 Jul 2026)

pre-orchestrate86d
13%

Idea review queue

pre-orchestrate52d
13%

Carry-forward — 4 Sep AoC seat

OPEN — carry-forward from the 4 Sep AoC 26d
10%

System 7 canon — the seven books, nose to tail, into code / lenses / the vault

OPEN — queued for the unsupervised build18d
10%

Estate check, 13 Sep 2026 — what Discord is reporting, what is actually broken, what was fixed, what is a gap

OPEN — estate check run 13 Sep 2026 12:017d
10%

Check estate-bound's first full run after the 24 Sep playbook fix

OPEN — due Fri 25 Sep 2026 09:00 BST (Zo7d
10%

`arxiv-find` crashes on every query: the arXiv export API now answers with an HTTP 302 the tool cannot follow

OPEN — tool repair, small, Cardinal 13 i6d
10%

Claude Code cloud-sessions credit — claim by 7 Oct, then use it as the estate's fifth host

OPEN — DIRECTOR ACTION with a deadline: 6d
10%

Five NIM models in `deep_read_panel` returned HTTP 410 Gone on 24 Sep 2026 (measured, not inferred)

OPEN — fleet hygiene, no Director decisi6d
10%

When Sonnet 5.5 / Haiku 5.5 ship — the Director's steering condition, made concrete

OPEN — waits on Anthropic shipping Sonne6d
10%

No-website prospects — outreach (Fri 25 Sep, 10:00–11:00)

OPEN6d
10%

Re-run the cross-family review of the typed-decision layer, then log findings

OPEN — the doctrine's step 3–7 (kimi-rev6d
10%

The brain — SR50 × the vault × AI-materials, as a tick loop

OPEN — queued for the unsupervised build5d
10%

Wondered, Monday 28 Sep: what needs doing

OPEN5d
10%

the-brain — first monthly review, due 25 Oct 2026

OPEN — due 2026-10-255d
10%

Brevo — send from our own address

OPEN — PINNED 28 Sep (Director), blocked2d
10%

E12 trend-book generator — queued 1 Oct 2026 (Director, mid-session)

QUEUED — not started0d
75%

Recent ships

last 14 days · 0 items